Train parts - CA-3-CC

1) CA-3 coupler and its parts, 2) SRT railway 1.05.003-2006, 3) Customized is available - details see: https://www.vehicleto.com/train-parts-10040016
Type: CouplingMaterial: Casting steelDimensions (L x W x H) (mm): As per drawingPlace of Origin: China (Mainland)
Brand Name: HengtaiModel Number: CA-3-CCvehicle linkage devices: couplerprocessing technique: casting
Train parts
contact supplier for Train parts


Sequence NO.Code NO.QuantityProduct NameMaterialWeightRemark
1HT/C-300B-011coupler body20Mn182.2
2HT/C-300H-011boltM10×90×30
3HT/C-300F-012washerφ10
4HT/C-300L-011lock holder20Mn4.5
5HT/C-300L-021Safety lock32Cr06Mn1.45
6HT/C-300L-031lock20Mn12.8
7HT/C-300H-021nutM10
8HT/C-300L-041lock lift pin20Mn3.51
9HT/C-300L-051lock lift20Mn2

SA3 Complete coupler according to the attached drawing and following spec.
Weight: 210 kg

Material tensile stregth: 539 MPa

Static tension test: 2800 kN

Russian standard Gost

Competitive price and delivery time

1,SA-3 railway coupler and coupler yoke are used on 1520mm broad gauge railway vehicles. Andabout5,000

tonnes heavy can be hauled.

2,SA-3 coupler is wildly used by former Soviet Union, and other countries. And the products weproduced

have been exported to United States, England, Sweden, Australia, Russia, Japan, Pakistan, Thailand,

Vietnam and other countries.

3,The factoryproduces steel casting,iron casting for industry with 40 years history, and in producingSA-3

couplerfor nearly 7 years reached to 4000 sets in total. It has a professional teamin metallurgy, foundry,heat treatment, and mechanical design and manufacture etc..

4,The main production lines aretwo molding making lines of vapor replaced hardening(VRH) made inWestern

Sinto of Japan; a gas impact molding line for iron-casting from Spain, and other producing and test facilities.

5, We have the ISO9001 quality management system certificates.

Besides of complete CA-3 coupler, we would like to supply its parts, such as lock, lock holder,

locklifter, lock lifter pin, etc.

If you are interested and want to know details, please feel free to contact us.

Packaging Detail:pallet or wooden case; as per customer requrimented
Delivery Detail:30-60 days

Related Product for Train parts