Joint bars/railway splice made in China - 75KG
1)Produces GB/BS/JIS/DIN/UIC /ANSI/ASTM standard fishplates 2)Supply according to your drawings, 3)Can bid for railway projects - details see: https://www.vehicleto.com/joint-bars-railway-splice-made-in-china-10034732
Type: Tie Plates | Material: 60Si2MnA,60Si2MnB,60Si2Cr,etc. | Dimensions (L x W x H) (mm): GB/BS/JIS/DIN/UIC /ANSI/ASTM,etc | Place of Origin: Henan China (Mainland) |
Brand Name: ALD | Model Number: 75KG | Surface: Nutral,balck,oiled, plain ,plated etc | Certificate: ISO9001-2000 |
QS: SGS |
No. | Product Name | Product Standard | Specification | Material |
1 | Screw Spike | TB/T564-92 | M24*185/M24*195 | Q235 |
2 | Dog Spike | TB/T564-92 | 16*16*165 | A3 |
3 | Common Spike | TB/T1346-79 | 16*16*165 | Q235,35# |
4 | Railway Track Spike | GB,DIN,BS,JIS | Q235,35# | |
5 | Anchor Bolt | GB,DIN,BS | WJ-7 | Q235 |
6 | Apron Block | TBT1495.3-92 | 2-4#0-6# | Polyamide 66 |
7 | Bubble fish plate for railwy project | TB/T2342.3-93 | p50/p60,43KG/50KG/60KG | B6/B7 |
8 | Gauge Apron | TB/T1495.3-92 | 6#,10#,ect | Q235 |
9 | Gauge Aprons | TB/T1495.3-92 | 14#,20# ect | Q235 |
10 | Gauge Apron | TB/T1495.3-92 | WJ-8MiddleorJoint | Polyamide 66 |
11 | Flat/spring warsher | TB/T1495.4 | all kinds | steel,Q235,Stainless steel |
12 | Elastic rail clip | TBT1495.2-92 | SKL12,SKL14 G/W type | 60Si2Cr/60Si2MnA |
13 | Nylon Insulator | GB/BS/DIN | All kinds | Nylon |
14 | Railway clip | TB/T3065.2-92 | A/B TYPE,ect | 60Si2Cr/60Si2MnA |
15 | Rubber Pad | z*3351-4 | WJ-8 | Synthetic rubber |
16 | Square head screw spike | GB,DIN,JIS,BS | 22*145/155/165 | Q235A |
17 | rail pad | GB/BS/DIN | all kinds | EVA |
18 | Plastic dowel | GB/BS/JIN/DIN | all kinds | PA66 |
19 | guide plate | |||
20 | Tie plate | GB/TB/DIN/JIS/BS | all kinds | QT400-15/QT450-10 |
21 | base plate | QT500-7/ZG25 | ||
22 | rail fixing base | ZG35/ZG45 | ||
23 | Steel heavy rail for railwy project | GB/DIN/BS | many kinds | QT400-15/QT450-10 |
Packaging Detail:According to customers' requirements |
Delivery Detail:30 days after the advanced payment |