Casting Train Parts - JGQ

1, Casting Train Parts, railway parts, 2, carbon steel, stainless steel, 3, your drawing is welcomed - details see: https://www.vehicleto.com/casting-train-parts-10039576
Type: BrakesMaterial: steelPlace of Origin: Shandong China (Mainland)Brand Name: JGQ
Model Number: JGQparts: train  
Casting Train Parts
contact supplier for Casting Train Parts


1, Casting Train Parts, railway parts, casting train parts
2, carbon steel, stainless steel
3, your drawing is welcomed

1. Product Name: Investment Casting / Precision Casting Parts / ball Valves / stainless steel sand casting parts / machinery parts / CNC machining parts, Steel Investment Casting / lost wax / casting / die casting

2. Progress of precision casting: Investment casting
3. Precision Casting materials: Stainless steel, Carbon steel,iron steel, alloy
4. We can do different kinds of surface treatment after casting, such as machining, polishing, and plating
5. All sorts of precision casting parts: marine casting parts, auto parts, machinary casting parts, pump parts, hardware parts

6.OEM are welcomed.

PROCESS

MATERIALSTANDARD

SAND CASTING

Green Sand

Grey Iron, Ductile Iron, Malleable Iron, Stainless Steel, Carbon Steel, Aluminium, Brass, Bronze

AISI

ASTM

DIN

GB

BS

JIS

NF

AAR

Furan Resin Sand
Cold Harden Resin Sand

INVESTMENT CASTING

Sodium Silicone

(Water Glass)

Stainless Steel, Carbon Steel, Special Alloy Steel, Bronze, Brass, Aluminium

Silica Sol


FORGING

Hammer Forging

Stainless Steel, Carbon Steel, Alloy Steel, Brass, Aluminium

Die Forging
Roll Forging
STAMPING MACHININGAll Metal Material
Quality System CertificateISO 9000
Dimension ToleranceCT7
Surface RoughnessRa6.4~12.5
Casting Weight0.05~500KG
Annual Production Capability7000 tons per year
InspectionChemical Composition Analysis,

Tensile Test, Dimension Inspection, Hardness Testing

Surface TreatmentHeat Treatment, Machine, Polishing, Chrome, Zinc, Nickel Plating
PackingCartons, Wooden Case, Steel Cases, Pallets
Advantage1. more than 20 years experience

2. 15-20 days delivery after deposit

3. Spectral analysis of rawmaterial and liquid melt, batch before casting

4. Control spectral and thermal analysis equipment (density and processing)

5. Passed ISO 9000

1. These parts are used in machine assembly, valve &pump parts, auto &motorcycle parts, train & railway parts, marine hardware, construction hardware, electrical, furniture, etc.

2. Your drawings or samples are welcome for customized.

3. We warmly welcome your business connection and visit.

Packaging Detail:Indivial packing in carboard box
Delivery Detail:15-20 days after receiving deposit

Related Product for Casting Train Parts